We are almost finished with the design phase of the Hotel Phase 2. We built the original building in 2005. The 2nd Phase will add 24 hotel rooms along with conference rooms, breakfast area, and offices for hotel staff. The Building will be very energy efficient and green just like the 1st phase. We are using Premium Steel Building system for the building envelope. There panels are solid EPS foam panels with metal stud supports with an R value of 32 and no thermal bridging. There will be a 30kw PV solar system with thermal solar for all of the buildings domestic hot water.